G08 walkdowns are created at the project level.
G08 walkdowns aggregate across the project.
Template design and sign-offs follow the same flow as Walkdowns — MLP.
Tabs in View match the MLP walkdown (Details, Activity, sign-offs, punches).
Last updated 10 minutes ago